• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
McFaddin-Ward Historic House Museum

The McFaddin-Ward House

Historic House Museum in Beaumont, Texas

  • Tours
  • Events
  • Explore
    • Latest News
    • Videos
    • Viewpoints
  • Exhibits
  • Education
    • Lesson Plans
    • Games & Activities
    • Homeschool Workshops
    • Podcast: 1906 McFaddin Ave
      • Episode 1 – Apron Strings: Ties to the Past
      • Episode 2 – A Merry McFaddin Christmas
      • Episode 3 – Continuing the Conversation Beyond Black History Month: The Complexities of Race in Texas 1830 – 1877
      • Episode 4: Continuing the Conversation: Staff Life at the McFaddin-Ward House
      • Episode 5: Continuing the Conversation: The Story of Charlton-Pollard
  • About Us
    • The Organization
    • The Built Environment
    • History of The House
    • People of the McFaddin-Ward House
    • Volunteer
    • Careers
    • Foundation and Grants
  • Contact

Electrical Upgrade Project Update – Phase 2

You are here: Home / News / Electrical Upgrade Project Update – Phase 2
August 4, 2023

Beaumont, TX; August 4, 2023 – The first part of Phase 2 of the McFaddin-Ward House electrical upgrade, which has focused on plaster repair work and painting, is nearing completion.

Over the past two months, the team from Rutledge Paint Company of Vidor has been hard at work patching up areas where electrical work required cutting into walls and ceilings, texturing as needed, and repainting. Areas of trim and baseboard also received repairs and fresh coats of paint. More than 30 shades of paint were needed for the job as each room required different colors. Matching shades proved to be a bit of a challenge, but the team worked diligently to ensure a seamless finish in every spot. All walls and ceilings on the first two floors of the historic house have been completed.

While the first two floors called for new paint, the third floor walls are covered in unique papers from Bradbury and Bradbury, a California company that specializes in reproducing 19th and 20th century wallpapers. Bradbury & Bradbury furnished the wall and ceiling paper for the third floor when it was restored and opened to the public in 2006 and are again supplying identical wall and ceiling paper as we refresh these areas as part of the electrical upgrade to the historic house. The new wallpaper is on the way, and installation will begin soon.

The second part of Phase 2, which includes a thorough interior cleaning, reset of the house’s furniture, and reinstallation of interpretation objects, is already underway. As repairs and painting in each room wrapped, our curatorial team and museum technicians have been busy restoring the house to its former glory. The hardwood floors and furniture have been polished to a brilliant shine, rugs and draperies are being thoroughly cleaned and vacuumed, and furniture and objects are returning to their respective rooms.

Work on restoring and rewiring the house’s historic light fixtures continues at Crenshaw Lighting in Floyd, Virginia with a projected return in late September.

Current plans for our grand reopening are for late October/early November following reinstallation of the light fixtures.

Category: News
Previous Post:Viewpoints Vol 39 – No 3
Next Post:McFaddin-Ward House announces Fall 2023 Public Programming

Sidebar

Email Updates

Be the first to learn about events.

  • This field is for validation purposes and should be left unchanged.
  • TripAdvisor

Visitor Center

1906 Calder Avenue, Beaumont, Texas 77701 | 409-832-2134

Administration

725 Third Street, Beaumont, Texas 77701-1629 | 409-832-1906

Social Media

  • Facebook
  • Instagram
  • YouTube

Copyright © 2025 · The McFaddin-Ward House · All Rights Reserved · Site by Design Chute · Log in